The Aramco Reservoir Control Building

Project Information

  • Client:Aramco
  • Date:Feb 01, 2020
  • Author: The Aramco Reservoir Control Building
  • Place: Jeddah

The Aramco Reservoir Control Building

A project to establish a solar power station connected to the grid in the Aramco Reservoir Control Building - Jeddah /2020

PROJECT NAME

solar power station

CLIENT NAME

Aramco

SCOPE OF WORK

A project to establish a solar power station connected to the grid
in the Aramco Reservoir Control Building.